Put some time into the lab the last two days. Primarily playing around with some STP scenarios. Mostly using four of my Cisco 2950 switch’s to simulate specific desired topologies. Want to know exactly how the network would converge regardless of the failed component. Was fairly easily, hardest part was probably doing up the diagram and patching in the cross over cables.
Either way good to get time in on the lab. Wanted to play around with MST a bit; however, I did not have the time to do up those configurations. Hopefully I can revist that topic a bit later.
Advertisement